Individual project

Destacker DP,1000S – top loading

Description of the destacking process.

Project type Individual solution
Presentation Separate project
Technical data defined individually
Read project details

About this project

Description of the destacking process. A stack of 9–10 E2 Euro containers is placed in the loading zone, and the machine automates separating the containers and feeding them into the next process.

Technical data

Output do 1000 pcs/h
L = length 5010 (z obrotnicą) mm
B = width 1432 mm
H = height 2500 mm
Supply voltage 3 x 400 / 230 V
Total power 3 kW

Other individual projects

See all projects

FAQ

Frequently asked questions

How should Destacker DP,1000S – top loading be selected for a production process?

Selection of Destacker DP,1000S – top loading should start with product type, expected output, available space, loading method and hygiene requirements.

Can the device be adapted to the plant?

Yes. Chemaxpol can prepare a configuration for specific operating conditions, line layout and process requirements.

What information is useful for a quote?

Send the product type, expected output, available space, required functions and information about the current production line.

Technical support and service

Chemaxpol supports selection, production and later maintenance of equipment, so a technical inquiry should include operating conditions and expected output.

Technical consultation before selecting a model or configuration.

Dimensions, parameters and working layout can be adapted to the process.

Service support and direct producer contact after commissioning.

Device selection

Need a technical consultation?

Contact us. We will help select a model or configuration for your process.